Camera SLVS-EC v.2.0 5.0Gbps / MIPI D-PHY v2-1 4.5Gbps combo Receiver 4-Lane
TSMC Announces Intention to Build and Operate an Advanced Semiconductor Fab in the United States
Hsinchu, Taiwan, R.O.C., May 15, 2020 – TSMC (TWSE: 2330, NYSE: TSM) today announced its intention to build and operate an advanced semiconductor fab in the United States with the mutual understanding and commitment to support from the U.S. federal government and the State of Arizona.
This facility, which will be built in Arizona, will utilize TSMC’s 5-nanometer technology for semiconductor wafer fabrication, have a 20,000 semiconductor wafer per month capacity, create over 1,600 high-tech professional jobs directly, and thousands of indirect jobs in the semiconductor ecosystem. Construction is planned to start in 2021 with production targeted to begin in 2024. TSMC’s total spending on this project, including capital expenditure, will be approximately US$12 billion from 2021 to 2029. This U.S. facility not only enables us to better support our customers and partners, it also gives us more opportunities to attract global talents. This project is of critical, strategic importance to a vibrant and competitive U.S. semiconductor ecosystem that enables leading U.S. companies to fabricate their cutting-edge semiconductor products within the United States and benefit from the proximity of a world-class semiconductor foundry and ecosystem.
TSMC welcomes continued strong partnership with the U.S. administration and the State of Arizona on this project. This project will require significant capital and technology investments from TSMC. The strong investment climate in the United States, and its talented workforce make this and future investments in the U.S. attractive to TSMC. U.S. adoption of forward-looking investment policies to enable a globally competitive environment for a leading edge semiconductor technology operation in the U.S. will be crucial to the success of this project. It will also give us the confidence this and other future investments by TSMC and its supply chain companies will be successful.
In the United States, TSMC currently operates a fab in Camas, Washington and design centers in both Austin, Texas and San Jose, California. The Arizona facility would be TSMC’s second manufacturing site in the United States.
|
Related News
- TSMC to Build Specialty Technology Fab in Japan with Sony Semiconductor Solutions as Minority Shareholder
- After TSMC fab in Japan, advanced packaging facility is next
- Keysight, Synopsys, and Ansys Accelerate RFIC Semiconductor Design with New Reference Flow for TSMC's Advanced 4nm RF FinFET Process
- TSMC, Bosch, Infineon, and NXP Establish Joint Venture to Bring Advanced Semiconductor Manufacturing to Europe
- TSMC Announces the Opening of Advanced Backend Fab 6, Marking a Milestone in the Expansion of 3DFabric™ System Integration Technology
Breaking News
- Ceva multi-protocol wireless IP could simplify IoT MCU and SoC development
- Controversial former Arm China CEO founds RISC-V chip startup
- Fundamental Inventions Enable the Best PPA and Most Portable eFPGA/DSP/SDR/AI IP for Adaptable SoCs
- Cadence and TSMC Collaborate on Wide-Ranging Innovations to Transform System and Semiconductor Design
- Numem at the Design & Reuse IP SoC Silicon Valley 2024
Most Popular
- GUC provides 3DIC ASIC total service package to AI/HPC/Networking customers
- Qualitas Semiconductor Appoints HSRP as its Distributor for the China Markets
- Siemens collaborates with TSMC on design tool certifications for the foundry's newest processes and other enablement milestones
- Credo at TSMC 2024 North America Technology Symposium
- Huawei Mate 60 Pro processor made on SMIC 7nm N+2 process
E-mail This Article | Printer-Friendly Page |